Additional information on some current and recently completed projects can be found below.

 

This project involved the construction of a new substation in Kettle Valley, upgrades to the electrical system and installation of a high speed communication system.

MCW — Kettle Valley

Substation + Transmission & Distribution Lines

160 MW project to be located near the site of the existing Kingsbridge I Wind Power Project near Goderich, Ontario

A 635 MW  natural gas-fired combined cycle electricity generating facility to be built in St. Clair Township, near Sarnia, Ontario.

St. Clair Energy Centre

Epcor — Kingsbridge Wind Power Project — Phase II

500 kV Substation + 34.5 kV Transmission Line

Sample Projects

Engineering Solutions

Chimax Inc.

to power your lives

to empower your community

Chimax Inc.

To contact us:

 

General Inquiries

3950 Fourteenth Avenue

Suite 506
Markham, Ontario,

L3R 0A9

Canada

 

Tel : (905) 305-6133

Fax : (905) 305-6132

E-mail : chimax@chimax.ca

Goreway station is a natural gas-fuelled combined cycle power station located in Brampton, Ontario slated to be in-service by the end of 2008.

Sithe Energies Canadian Development Ltd. — Goreway Station 875 MW Generating Station + 230 kV Transmission Line